PHOSPHOSENS® PHOSPHATASE ASSAY CATALOG

Continuous Phosphatase Activity Assays for 50 Validated Targets

A PhosphoSens® phosphatase activity assay is a continuous, real-time fluorescence assay that measures phosphatase catalytic activity directly at the substrate level, using the same continuous detection chemistry validated across AssayQuant's kinase assay platform. Each well generates a full kinetic progress curve, supporting IC₅₀, selectivity, and mechanism-of-action studies.

Phosphatases are studied far less often than kinases despite being equally central to signaling regulation — most available assays are indirect, antibody-based, or endpoint-only. AssayQuant's catalog covers 50 validated phosphatase targets across major phosphatase families (PPP, PPM, PTPN, PTPR, DUSP, and others).

50

Validated Phosphatase Targets

2

Assay Formats & Sample Types

1536

Well Plate Compatible

NCI Funded

 MIT-licensed technology 

PhosphoSens — How It Works, Phosphatase (reference mockup v3, style-guide colors)
Mechanism

How PhosphoSens® Phosphatase Assays Work

Most phosphatase activity assays measure activity indirectly, in one of two ways. Generic fluorogenic substrates like DiFMUP, or colorimetric methods like malachite green, detect free phosphate release from a small-molecule probe — they confirm that some phosphatase activity occurred, but not whether it happened on your target's actual physiological substrate sequence, since any phosphatase can cleave a generic phosphate ester. Antibody-based phospho-detection methods have the opposite problem: they confirm a residue's phosphorylation state at one moment, not the catalytic dephosphorylation event itself. Both approaches add reagents, add assumptions, and collapse the reaction into a single generic or indirect readout.

PhosphoSens® skips that chain entirely. Each sensor peptide substrate is synthesized to match the target phosphatase's actual physiological substrate sequence, with a small fluorescent tag — Sox — built directly into the peptide, positioned right next to the phospho-residue being removed. The moment dephosphorylation happens, the signal changes. No generic phosphate-release probe. No antibody has to find anything.

Direct
The signal comes from dephosphorylation of your target's own physiological substrate sequence — not an antibody, a generic phosphate-release probe, or a downstream proxy.
Catalytic
Reports true enzyme turnover, not a single binding or occupancy snapshot.
Continuous
Fluorescence is tracked throughout the reaction, not sampled at one time point.
One reagent addition. Combine the pre-phosphorylated substrate with active phosphatase and read — every well returns a full kinetic progress curve of dephosphorylation.
01 / Combine
Phosphatase + pre-phosphorylated sensor peptide
The active phosphatase is added directly to a reaction containing the pre-phosphorylated PhosphoSens sensor peptide substrate — one addition, no free-phosphate detection reagent required.
02 / React
Dephosphorylation occurs
The phosphatase removes the phosphate group from the substrate, immediately adjacent to the built-in Sox tag.
03 / Signal
Sox fluorescence decreases on dephosphorylation
Loss of the phosphate reduces the chelation-enhanced fluorescence signal directly and proportionally — no secondary reaction, no generic phosphate-detection substrate.
04 / Read
Signal is read continuously
The plate reader tracks the fluorescence decrease throughout the reaction, generating a full kinetic progress curve of phosphatase activity rather than a single endpoint value.
PhosphoSens phosphatase mechanism: pre-phosphorylated sensor peptide substrate, phosphatase-catalyzed dephosphorylation adjacent to the Sox tag, and the resulting real-time fluorescence decrease and kinetic progress curve
Original AssayQuant PhosphoSens® phosphatase mechanism graphic
Target-specific physiological substrate No antibody required No wash or capture steps Full kinetic progress curve Physiological Mg²⁺/Mn²⁺ compatible
Sox (sulfonamido-oxine) is a patented fluorescent amino acid developed in the Imperiali Lab at MIT and exclusively licensed by AssayQuant. Phosphorylation increases Sox's affinity for Mg²⁺, producing a chelation-enhanced fluorescence (ChEF) signal — PhosphoSens phosphatase assays start with a pre-phosphorylated sensor peptide and track the resulting decrease in fluorescence as the target phosphatase removes the phosphate group, in real time, in the same well, with no antibody, generic phosphate-release probe, or additional reagent required. The underlying sensor chemistry spans a library of >50,000 optimized Sox-based substrates across the kinome and phosphatome.
reference mockup v3 — style-guide colors/type applied
FIND YOUR FORMAT

Choose the Format That Fits Your Research

Not all phosphatase assays are built the same. Select the format that matches how you work — in-house kits or a fully managed CRO service.

Real-Time, Continuous Assay Format

PhosphoSens-Kinetic

Generates a full activity progress curve in every well. Ideal for IC₅₀, Kᵢ, kobs, TDI, and mechanistic characterization. No endpoint assumptions.

Learn More →
CRO Service

Need a CRO to run it?

KinSight™ profiling services run your compounds against our 560+ kinase panel. You receive annotated kinetic reports with TDI flags and MOA insights — in two weeks.

Explore KinSight™ Profiling →
WHY PHOSPHOSENS

Why Researchers Choose PhosphoSens® Over Endpoint Methods

Most phosphatase assays give you a single data point at a single moment in time. PhosphoSens generates a continuous activity trace — so you see the full kinetics, not just a snapshot.

True initial rates, no artifacts

Calculate rates from the true linear region of the progress curve — free from lag phase, substrate depletion, or enzyme instability artifacts.

Detect TDI and slow-binding inhibitors

Capture time-dependent mechanisms — TDI, slow-on/slow-off, irreversible binding — that endpoint assays miss entirely.

Physiologically relevant conditions

Compatible with physiological ATP, Mg²⁺, Mn²⁺, and Ca²⁺. Validated substrates with defined phospho-acceptor sites — no antibody cross-reactivity.

Platform comparison
Platform Measures activity directly Detects time dependent inhibition Real-time kinetic readout Uses your target's physiological substrate Detects all inhibitor types
AssayQuant PhosphoSens®
Generic fluorogenic substratese.g. DiFMUP, pNPP
Colorimetric phosphate detectione.g. Malachite Green Assay-Dependent
Radiometric assayse.g. ³²P filter/charcoal separation
Phospho-specific antibody detectione.g. phospho-ELISA, western blot
Measure Endogenous Activity

Kinase Activity Directly From Cell Lysates

Skip the purified enzyme. PhosphoSens-Lysate assays measure kinase activity in native cellular context — capturing the biology your recombinant assays can't.

Expand Your Target Coverage

Continuous Phosphatase Activity Assays

The same real-time, direct measurement you rely on for kinases — now for phosphatases. 50 validated targets, same PhosphoSens® platform.

DOWNLOAD

From Single Time Points to Mechanistic, Decision-Ready Data

AssayQuant’s PhosphoSens® real-time kinetic assays overcome the fundamental limitations of traditional kinase and phosphatase technologies. DOWNLOAD TO LEARN MORE.

5 Challenges of using Kinase and Phosphatase Assays_AssayQuant_Page_1
PHOSPHATASE ASSAY CATALOG

Explore 50 Validated Phosphatase Assay Targets

Search by gene symbol, target family, or indication. Each target page includes available formats, substrates, enzymes, pricing, and application notes.

PhosphoSens-Kinetic Product Catalog

For your convenience, you can also download a PDF version to review later or share with your colleagues.

Download

PhosphoSens® Phosphatase Activity Assay Catalog

Search 50+ protein phosphatase targets. Every assay is a continuous, no-antibody, real-time readout on a physiological peptide substrate — not a small-molecule surrogate.

50 of 50 targets
Target name Type Family WT / Mutant Full name Substrate & Enzyme Format & Status Product Page
ACP1 ACP (acid phosphatase) Wild-Type AQT1372
Kinetic
View Product Page →
ACP3 ACP (acid phosphatase) Wild-Type AQT0737
Kinetic
View Product Page →
ACP5 ACP (acid phosphatase) Wild-Type AQT1372
Kinetic
View Product Page →
ACP6 ACP (acid phosphatase) Wild-Type AQT1372
Kinetic
View Product Page →
ALPI ALPI (alkaline phosphatase) Wild-Type AQT0737
Kinetic
View Product Page →
CDC25A Dual (Y) CDC25 Wild-Type cell division cycle 25A AQT0523
AQT-C04-20G
Kinetic
View Product Page →
CDC25B Dual (Y) CDC25 Wild-Type cell division cycle 25B AQT0523
AQT-C04-20BG
Kinetic
View Product Page →
CDC25C Dual (Y) CDC25 Wild-Type cell division cycle 25C AQT0523
AQT-C04-20CG
Kinetic
View Product Page →
DUSP1 DUSP (dual-specificity phosphatase) Wild-Type AQT0523
Kinetic
View Product Page →
DUSP10 DUSP (dual-specificity phosphatase) Wild-Type AQT0737
Kinetic
View Product Page →
DUSP14 DUSP (dual-specificity phosphatase) Wild-Type AQT0737
Kinetic
View Product Page →
DUSP22 Dual DUSP (dual-specificity phosphatase) Wild-Type dual specificity phosphatase 22 AQT0737
AQT-D22-20G
Kinetic
View Product Page →
DUSP23 DUSP (dual-specificity phosphatase) Wild-Type AQT1372
Kinetic
View Product Page →
DUSP3 Dual (Y) DUSP (dual-specificity phosphatase) Wild-Type dual specificity phosphatase 3 AQT0264
Kinetic
View Product Page →
DUSP6 DUSP (dual-specificity phosphatase) Wild-Type AQT0523
Kinetic
View Product Page →
EYA4 EYA (Eyes Absent family) Wild-Type AQT0737
Kinetic
View Product Page →
PHLPP1 Ser/Thr PHLPP Wild-Type PH domain and leucine rich repeat protein phosphatase 1 AQT0481
Kinetic
View Product Page →
PHLPP2 Ser/Thr PHLPP Wild-Type PH domain and leucine rich repeat protein phosphatase 2 AQT0481
Kinetic
View Product Page →
PPM1A Ser/Thr PPM (Mg2+/Mn2+-dependent Ser/Thr phosphatase) Wild-Type protein phosphatase, Mg2+/Mn2+ dependent 1A AQT0267
AQT-P02-20BG
Kinetic
View Product Page →
PPM1D Ser/Thr PPM (Mg2+/Mn2+-dependent Ser/Thr phosphatase) Wild-Type protein phosphatase, Mg2+/Mn2+ dependent 1D AQT0525
AQT-P04-20G
Kinetic
View Product Page →
PPM1F Ser/Thr PPM (Mg2+/Mn2+-dependent Ser/Thr phosphatase) Wild-Type protein phosphatase, Mg2+/Mn2+ dependent 1F AQT0523
Kinetic
View Product Page →
PPM1G Ser/Thr PPM (Mg2+/Mn2+-dependent Ser/Thr phosphatase) Wild-Type protein phosphatase, Mg2+/Mn2+ dependent 1G AQT0267
AQT-P07-20G
Kinetic
View Product Page →
PPP1CA Ser/Thr PPP (Ser/Thr phosphatase) Wild-Type protein phosphatase 1 catalytic subunit alpha AQT0480
AQT-P13-20G
Kinetic
View Product Page →
PPP1CB Ser/Thr PPP (Ser/Thr phosphatase) Wild-Type protein phosphatase 1 catalytic subunit beta AQT0523
AQT-P14-20G
Kinetic
View Product Page →
PPP2CA Ser/Thr PPP (Ser/Thr phosphatase) Wild-Type protein phosphatase 2 catalytic subunit alpha AQT0523
Kinetic
View Product Page →
PPP2CB Ser/Thr PPP (Ser/Thr phosphatase) Wild-Type protein phosphatase 2 catalytic subunit beta AQT0523
Kinetic
View Product Page →
PPP3CA/B Ser/Thr PPP (Ser/Thr phosphatase) Wild-Type protein phosphatase 3 catalytic subunit alpha/beta AQT0670
Kinetic
View Product Page →
PTPN1 Tyr PTPN (non-receptor PTP) Wild-Type protein tyrosine phosphatase non-receptor type 1 AQT0266
AQT-P28-20G
Kinetic
View Product Page →
PTPN11 Tyr PTPN (non-receptor PTP) Wild-Type protein tyrosine phosphatase non-receptor type 11 AQT0737
AQT-P38-20G
Kinetic
View Product Page →
PTPN12 Tyr PTPN (non-receptor PTP) Wild-Type protein tyrosine phosphatase non-receptor type 12 AQT0737
AQT-P39-21G
Kinetic
View Product Page →
PTPN13 Tyr PTPN (non-receptor PTP) Wild-Type protein tyrosine phosphatase non-receptor type 13 AQT0737
AQT-P40-21G
Kinetic
View Product Page →
PTPN2 Tyr PTPN (non-receptor PTP) Wild-Type protein tyrosine phosphatase non-receptor type 2 AQT0266
AQT-P29-20G
Kinetic
View Product Page →
PTPN22 Tyr PTPN (non-receptor PTP) Wild-Type protein tyrosine phosphatase non-receptor type 22 AQT0737
Kinetic
View Product Page →
PTPN4 Tyr PTPN (non-receptor PTP) Wild-Type protein tyrosine phosphatase non-receptor type 4 AQT0737
Kinetic
View Product Page →
PTPN5 Tyr PTPN (non-receptor PTP) Wild-Type protein tyrosine phosphatase non-receptor type 5 AQT0664
Kinetic
View Product Page →
PTPN6 Tyr PTPN (non-receptor PTP) Wild-Type protein tyrosine phosphatase non-receptor type 6 AQT0737
AQT-P33-20G
Kinetic
View Product Page →
PTPN7 Tyr PTPN (non-receptor PTP) Wild-Type protein tyrosine phosphatase non-receptor type 7 AQT0772
AQT-P34-20G
Kinetic
View Product Page →
PTPN9 Tyr PTPN (non-receptor PTP) Wild-Type protein tyrosine phosphatase non-receptor type 9 AQT0737
Kinetic
View Product Page →
PTPRA Tyr PTPR (receptor-type PTP) Wild-Type protein tyrosine phosphatase receptor type A AQT0667
AQT-P48-21G
Kinetic
View Product Page →
PTPRB Tyr PTPR (receptor-type PTP) Wild-Type protein tyrosine phosphatase receptor type B AQT0667
AQT-P49-21G
Kinetic
View Product Page →
PTPRC Tyr PTPR (receptor-type PTP) Wild-Type protein tyrosine phosphatase receptor type C AQT0630
AQT-P50-21BG
Kinetic
View Product Page →
PTPRE Tyr PTPR (receptor-type PTP) Wild-Type protein tyrosine phosphatase receptor type E AQT0667
AQT-P52-21G
Kinetic
View Product Page →
PTPRF Tyr PTPR (receptor-type PTP) Wild-Type protein tyrosine phosphatase receptor type F AQT0737
AQT-P53-21G
Kinetic
View Product Page →
PTPRG Tyr PTPR (receptor-type PTP) Wild-Type protein tyrosine phosphatase receptor type G AQT0667
Kinetic
View Product Page →
PTPRJ Tyr PTPR (receptor-type PTP) Wild-Type protein tyrosine phosphatase receptor type J AQT0737
AQT-P56-21G
Kinetic
View Product Page →
PTPRM Tyr PTPR (receptor-type PTP) Wild-Type protein tyrosine phosphatase receptor type M AQT0737
Kinetic
View Product Page →
PTPRQ PTPR (receptor-type PTP) Wild-Type AQT0737
Kinetic
View Product Page →
PTPRS Tyr PTPR (receptor-type PTP) Wild-Type protein tyrosine phosphatase receptor type S AQT0737
AQT-P64-21G
Kinetic
View Product Page →
PPM1H Ser/Thr PPM (Mg2+/Mn2+-dependent Ser/Thr phosphatase) Wild-Type protein phosphatase, Mg2+/Mn2+ dependent 1H AQT0523
Kinetic
View Product Page →
PTPN11 [T253M/Q257L] Tyr PTPN (non-receptor PTP) Mutant protein tyrosine phosphatase non-receptor type 11 AQT0737
Kinetic
View Product Page →
GET A RECOMMENDATION

Not Sure Which Assay Fits Your Target?

Tell us your target and research application and we'll point you to the right assay format, substrate, and enzyme. No obligation — just a faster path to the right kit.

GO DEEPER

Resources for Phosphatase Assay Scientists

COMMON QUESTIONS

Frequently Asked Questions

What is a PhosphoSens® phosphatase assay?

PhosphoSens is a continuous, real-time fluorescence assay that tracks phosphatase-catalyzed dephosphorylation as it happens, well by well, rather than reading a single timepoint. It uses substrates built around native phosphosite sequences instead of a generic fluorogenic reporter like DiFMUP, so the signal reflects true catalytic turnover on a physiologically relevant substrate.

Why measure phosphatase activity directly instead of using a phospho-antibody readout?

Phospho-antibody methods infer phosphatase activity indirectly, from the disappearance of a phospho-signal at a fixed endpoint. PhosphoSens measures the phosphatase acting on its substrate continuously and directly, without relying on antibody specificity or wash-step consistency.

How does a continuous kinase assay detect time-dependent inhibition (TDI)?

TDI compounds produce a characteristic change in the progress curve shape — the inhibition deepens over time as the compound slowly occupies or covalently modifies the enzyme. Because PhosphoSens monitors activity continuously, this curve deviation is directly visible. Endpoint assays that measure at a single time point will either miss TDI entirely or mischaracterize its potency, depending on when they sample the reaction.

Do PhosphoSens phosphatase assays use a physiological substrate?

Yes — a sequence-specific peptide substrate rather than a small-molecule surrogate like pNPP or DiFMUP, which don't reflect how a phosphatase engages its native protein substrates.

Can't find my target in the catalog?

We offer custom assay development for kinase targets not currently in our catalog. Our team can design and validate a PhosphoSens substrate for your target, typically within 4–8 weeks per milestone. Contact us to discuss your target, timeline, and project requirements.

Can I get phosphatase activity data without running the assay myself?

 Yes — KinSight Profiling now includes a phosphatase panel as a full CRO service. Send in your compounds and receive an annotated kinetic report. 

What is phosphatase selectivity profiling?

Phosphatase selectivity profiling measures how a compound affects the catalytic activity of protein phosphatases across a panel of related enzymes — not just one target in isolation. Because phosphatase active sites can share structural features across families, a compound optimized against one target can retain unwanted activity against others. Profiling maps that activity directly, rather than inferring it from binding alone.

Which phosphatase families are covered in the catalog?

 The catalog includes targets across the PPP (Ser/Thr), PPM (Mg²⁺/Mn²⁺-dependent), PTPN (non-receptor tyrosine), PTPR (receptor-type tyrosine), and DUSP (dual-specificity) phosphatase families, among others, covering 50 validated targets in total. 

Ready to Characterize Your Compound?

Talk to one of our scientists about your target, your workflow, and which assay format will get you the data you need.

Stay Informed

Want to hear the latest about our technology? Be among the first to learn about our latest products and services.

Cookie Settings / Do Not Sell or Share My Personal Information